Plan 02 / Custom designs

A 300-piece custom collection

Translate a distinct fit and design direction into four styles with clear specifications and a shared approval process.

Buyer brief
A brand developing its own studio collection
Example scope
300 pieces · 4 styles
Focus
Fit development & sample approval

Illustrative project plan — not a completed customer order. Quantities are planning examples; pricing and timing require a quotation.

One controlled development scope
Custom bra75
Crop top75
Shorts75
Leggings75

Illustrative planning example; not a completed customer order.

01 / The brief

Give a design direction a measurable specification

A brand wants a custom bra, crop top, short and legging with its own neckline, coverage and waist shape.

Before sampling, define measurements, material and construction. Review fit and intended support on physical samples.

The key decision

Focus on fit and silhouette, with one colour direction and shared material where suitable.

02 / The quantity plan

Four styles, one controlled development scope

Allocate 75 pieces per style. Replace the example size mix with one supported by your audience and fittings.

Illustrative allocation · one colour per style · individual garments
StyleSMLTotal
Custom bra20302575
Crop top20302575
Shorts20302575
Leggings20302575
Total pieces80120100300

The plan meets the 300-piece custom-design total, 30-piece style minimum and 3-piece minimum for each ordered size/colour combination. Material availability, custom dyeing, trims, sample costs and the development schedule still need a project-specific quotation.

Review the order rules

03 / The development decisions

Resolve the brief before adding detail

  1. Separate must-haves from preferences

    Prioritise rise, inseam, neckline and coverage. Mark optional seams and trims separately.

  2. Choose material for the garment's role

    Compare fabric composition, weight, stretch, recovery and surface finish against the intended activity. A common outer fabric may help the collection feel consistent, while the bra can still need its own lining or support construction. Approve the proposed combination before treating all four styles as equivalent.

  3. Manage revisions as one version

    Collect annotated photos, measurements and wearer comments in one dated revision sheet. State the observed issue, requested adjustment and point to recheck. Confirm any cost or timing change before another sample round; avoid conflicting instructions across messages.

04 / The sample gate

Use observations to decide what changes next

These are example review decisions, not defects reported on a completed project. The purpose is to agree how a sample is assessed and when another revision is necessary.

Waistband stability

If the waistband rolls during movement, record the size, wearer measurements and where it folds. Review height, tension and construction together. Recheck the revised sample before freezing the pattern.

Opacity & recovery

If coverage changes under stretch, review fabric, colour and fit together using the actual sample. If the garment bags after wear, record where it loses shape and compare recovery. Do not solve either issue by approving a fabric from its appearance alone.

Seams & grading

Check seams while the garment moves and stretches. Confirm the base-size measurements and agreed tolerances, then review the size set or grading evidence specified in the brief. One approved size does not establish every size's fit.

Final appearance

Review the approved colour, logo application, labels and packing together. Lock the final specification only when sample comments are closed; a later material or construction change needs review before production.

05 / The production handover

Leave production with one approved reference

A production-ready handover would bring the following into the same approved record:

  • Final specifications for all four styles, with measurement points, grading and agreed tolerances.
  • Approved material and colour references, trims, branding artwork and sample version.
  • The 300-piece size allocation, label content, packing details and delivery requirements.
  • The quotation, production schedule and inspection scope agreed for this order.
A useful handover closes each comment against an agreed reference. The sequence below is a planning walkthrough, not a record of a completed customer order.

Keep the bra and legging consistent

The same colour name does not establish a match. Review the proposed fabric combinations together.

Question to resolve
Do shade, surface finish and recovery suit both garments? Does the bra need different lining or support construction?
Decision to record
Choose the fabric combination and colour references to be used for sampling, with any differences stated.
Before approval
Compare the actual samples under the same lighting and confirm the intended pairing.

Make a waistband comment actionable

If a fitting reveals rolling or pressure, replace a broad request such as “make it more comfortable” with a specific review.

Question to resolve
Which size was tried, where does the waistband fold, and under which movement?
Decision to record
Agree which height, tension or construction change should be sampled, and record any quotation or schedule change.
Before approval
Recheck the revised sample at the same points. An open comment remains open until reviewed.

Keep one production reference

A fabric choice, fit change and label instruction must point to the same approved version.

Question to resolve
Are the sample, size specifications, branding and packing instructions consistent?
Decision to record
Identify the agreed versions and the inspection arrangements in the production handover.
Before approval
Confirm which changes are closed and which require another review. No fixed revision count or delivery result is assumed.

The intended result

A coordinated custom collection defined by an approved sample and specification for each style. The plan makes decisions traceable so inspection can compare production against the same reference. It does not assume a fixed number of sample rounds or a guaranteed launch date.

Build a brief for your collection

Send your style references, size quantities and target date. We will review the scope for a project-specific quotation.

Discuss Your Project
WhatsApp