Activewear production lead time
Plan sample approval, production, inspection and shipping as separate milestones. Confirm dates for your order.

Which date does your quotation promise?
| Date | What it settles | What remains outside it |
|---|---|---|
| Goods ready | Production and the agreed packing are complete. | Collection, export handling and transport may still follow. |
| Dispatch | The shipment is handed to the agreed carrier. | Transit, customs clearance and final delivery. |
| Delivered | Arrival at the agreed destination under the quoted shipping scope. | Confirm who handles clearance, duties and any delivery appointment. |
For a launch, request production and shipping estimates separately. Goods-ready is not a delivered date.
What must be closed before the clock starts?
| Dependency | Evidence to ask for | If it is still open |
|---|---|---|
| Material and colour | The actual fabric reference, colour approval and availability for the quantity ordered. | A sample made in substitute fabric does not confirm bulk material availability. |
| Fit and construction | An identified approved sample and the agreed size chart. | A pattern revision can require another sample and approval. |
| Logo, labels and packing | Final artwork, application, label text and packing quantities. | Late approvals may delay finishing or packing even if sewing is complete. |
| Order release | Confirmed quantities and the commercial start conditions stated in the quotation. | Ask which event starts the quoted production period; do not assume it began with the first enquiry. |
Which changes can move the date?
Fabric or colour changes reopen material approval; fit changes may require another sample. Branding, quantity or packing changes can also move the date.
Before accepting a change, confirm the revised price, sample scope and goods-ready date.
If the deadline is tight, reduce unresolved scope
An existing style may avoid a new pattern, but is not a stock promise. Ask which material and branding options meet the deadline.
If the required scope cannot arrive in time, choose a later launch or explicitly agree a reduced scope. Do not remove a required inspection or assume an order below the published minimum can be accepted to recover time. Discuss the style, quantity and arrival deadline.